22 Rigs. 4 AM. One Summary.
Barrel synthesizes overnight drilling reports, NPT events, frac crew status, and cost tracking into a single briefing — before your morning call.
Overnight summary — 22 rigs, 4 frac crews:
| Drilling on plan | 19 | |
| NPT events | 2 | Rig 8 (motor failure), Rig 15 (weather) |
| Frac on plan | 3 | |
| Frac NPT | 1 | Crew 4 (pump down issue, 6hr est) |
Total NPT cost overnight: ~$420K. Rig 8 motor replacement ETA 14:00 today. Weather hold on Rig 15 should clear by 08:00 per NWS forecast. Recommend moving Frac Crew 4 to standby well if pump issue exceeds 12hr.
Before and After Barrel
5 AM: overnight IADC reports from every rig. Each rig generates gigabytes of daily data. 6 AM drilling call — rig by rig: depth, footage, ROP, well control, days vs AFE. Then completions, frac crews, vendor calls.
Barrel's overnight synthesis: 22 rigs summarized, 2 NPT events flagged with cost estimates, frac crew status, AFE variances highlighted. Your drilling call starts with decisions, not data collection.
Built for the Morning Call
Multi-rig overnight synthesis — every rig summarized with exceptions flagged
NPT tracking and cost — downtime events with estimated cost impact
AFE variance monitoring — per-well cost vs authorization, trending analysis
Frac crew coordination — stage counts, pump-down status, schedule optimization
Weather and logistics — road closures, rig moves, water hauling
AFE Variance
AFE variance — active wells:
| Well 14-H | $8.2M vs $7.3M AFE | +12% — casing issue at 8,400ft |
| Well 22-H | $6.1M vs $6.8M AFE | -10% — ahead of plan |
| Well 9-H | $4.9M vs $5.0M AFE | -2% — on track |
Well 14-H variance driven by 3 extra casing runs at 8,400ft — lost circulation zone. Drilling engineer recommends LCM pill before next section. If successful, final cost estimate drops to $7.8M (+7% vs AFE).
Frac Crew Status
Completions status — 4 frac crews:
| Crew 1 | 28 stages today | Well 18-H — on schedule |
| Crew 2 | 32 stages today | Well 6-H — 2 stages ahead |
| Crew 3 | Mobilizing | Pad 7 — frac starts Mar 8 |
| Crew 4 | NPT — pump down | 6hr est, standby well ready |
Crew 4 pump-down issue: iron plug stuck at 7,200ft. Wireline crew en route — ETA 2 hours. If not resolved by 14:00, recommend moving to standby Well 11-H. No impact on monthly stage count target.
NPT Alert
Rig 8 motor failure — replacement ETA 14:00 today
5:30 AM
AFE Variance
Well 14-H running 12% over AFE — casing issue at 8,400ft
6:15 AM
Weather Hold
Rig 15 shut down — NWS forecast clears at 08:00
4:45 AM
Connects to Your Stack
Measured Impact
22 rigs
1 summary — operational synthesis
Minutes
NPT detected — not hours
AFE flagged
Variance caught before it's a surprise